Salvage Log — Day Five
Following a brief rest, operational duties resumed.
Maintenance contract assigned by Citizen for Prosperity.
MISC Prospector deployed to Bloom in Shepherd's Rest sector.
Task: replace two fuses and repair two damaged pipes on the installation.
Approach was methodical; no anomalies detected.
Encountered another explorer nearby, observed at safe distance.
Operations completed without interference. Systems verified operational.
Area cleared, no further contact required.
This entry concludes Day Five's maintenance log.
End of log.
Salvage Log — Day Five
Following a brief rest, operational duties resumed.
Maintenance contract assigned by Citizen for Prosperity.
MISC Prospector deployed to Bloom in Shepherd's Rest sector.
Task: replace two fuses and repair two damaged pipes on the installation.
Approach was methodical; no anomalies detected.
Encountered another explorer nearby, observed at safe distance.
Operations completed without interference. Systems verified operational.
Area cleared, no further contact required.
This entry concludes Day Five's maintenance log.
End of log.