Salvage Log — Day Fourteen
Departure sequence initiated from Lorville. Atmospheric clearance granted. Course plotted toward HUR-L2 sector.
Salvage contract accepted upon departure. Target identified: abandoned Crusader A2 Hercules Starlifter, drifting near Faithful Dream Station.
On-site arrival confirmed. Visual inspection conducted from external vantage point. Hull appears structurally intact. No active power signatures detected. No response to standard identification hails.
EVA initiated. Exited Reclaimer to perform close-range reconnaissance of target vessel. External hull shows signs of prolonged drift. Airlock access point identified.
Interior inspection postponed to Day Fifteen.
Current status: Holding position outside target vessel.
Salvage Log — Day Fourteen
Departure sequence initiated from Lorville. Atmospheric clearance granted. Course plotted toward HUR-L2 sector.
Salvage contract accepted upon departure. Target identified: abandoned Crusader A2 Hercules Starlifter, drifting near Faithful Dream Station.
On-site arrival confirmed. Visual inspection conducted from external vantage point. Hull appears structurally intact. No active power signatures detected. No response to standard identification hails.
EVA initiated. Exited Reclaimer to perform close-range reconnaissance of target vessel. External hull shows signs of prolonged drift. Airlock access point identified.
Interior inspection postponed to Day Fifteen.
Current status: Holding position outside target vessel.