Skip to Content

SALVAGE LOG - DAY NINE

January 21, 2026 by
m0nkey.t
| No comments yet


Salvage Log — Day Nine

Operator: m0nkey.t
Status: Independent Salvager
Vessel: Reclaimer
System: Stanton
Sector: CRU-L1 — Ambitious Dream Station
Operational Report

Departure logged from Seraphim Station at standard operational hours. New salvage contract accepted through authorized channels. Destination set for CRU-L1 orbital space.

An abandoned ARGO MOLE was detected drifting approximately twelve kilometers from Ambitious Dream Station perimeter. Initial scan revealed no active power systems. Hull appeared structurally intact.

Standard hailing protocols initiated across all emergency frequencies. No response detected. Secondary bioscan confirmed zero crew signatures aboard the vessel. Complete abandonment verified.

Reclaimer maneuvering system engaged. Vessel positioned for salvage operations. Hull integrity assessment completed. Mining equipment inventory catalogued remotely.

Internal data recovery attempted through external access ports. No flight logs recovered. Ship's recorder appeared either wiped or damaged beyond recovery. Crew departure circumstances remain undetermined.

Salvage protocols executed without incident. Materials secured and processed. Surrounding space maintained clear status throughout operation. No interference encountered.

End of log.

Transmission archived. Contract fulfilled.


Sign in to leave a comment
SALVAGE LOG - DAY EIGHT