Salvage Log — Day Seven
Departure initiated toward Pyro V under active salvage contracts. Mission parameters focused on hull recovery and material extraction.
An abandoned Origin 400i was located drifting beyond orbital lanes. Hull integrity stable. No power signatures detected. No response to standard hails.
Salvage operations commenced using the Reclaimer. Standard hull scraping protocols applied. No structural resistance encountered. Operation proceeded without incident.
No hostile signatures detected. Surrounding space remained quiet.
Materials recovered were secured and logged. Area cleared. Return course set toward Orbituary.
End of log.
Salvage Log — Day Seven
Departure initiated toward Pyro V under active salvage contracts. Mission parameters focused on hull recovery and material extraction.
An abandoned Origin 400i was located drifting beyond orbital lanes. Hull integrity stable. No power signatures detected. No response to standard hails.
Salvage operations commenced using the Reclaimer. Standard hull scraping protocols applied. No structural resistance encountered. Operation proceeded without incident.
No hostile signatures detected. Surrounding space remained quiet.
Materials recovered were secured and logged. Area cleared. Return course set toward Orbituary.
End of log.